TO: Risk Management, Claims and Recovery; Office of the City Attorney
FROM: D. Fenwick, Deputy Director, Bureau of Post-Incident Restoration
RE: Incident 4474 — one recovery page, five rows; the five jars as the City's standards; the hazard differential moved to the Acts of Cape line; 14th Street reopened 12:00 today
CC: Office of Caped Affairs; Transit Authority, Service Planning; Mayor's Office; Human Resources, Classification; 311 (routing)
Item one. The street.
Reopens: 12:00 today, kept. Barrels off the roadway 11:20. Glass swept at 14th and Kestrel: 11 windows, 40 feet of frontage. Crosswalk washed and dry 11:40. Handrail at the third landing replaced. Loads removed to date: 53. Crew hours to date: 462. Depth at the pumping chamber: 18 inches.
Vault clear: Friday 04:00, unchanged. Wash-down and handback 04:00 to 08:00. Pumps off the vault 08:00. Both dates were said before the week started and both of them held. The street is not the vault. That was in writing Wednesday and it is still the reason the two dates are two dates.
Item two. One page, five rows. Attached. This is the only arithmetic on the file that is entirely mine and it took the dump tickets to build.
Columns: incident number, material color, gallons removed, City removal cost at the standing contract rate, amount claimed, claimant age in days, registered agent address. Five rows.
Total City removal cost, five incidents: $1,340,000.00. Rows drawn from dump tickets and crew sheets already on file in this office, incident by incident, one ticket per load.
Four of the five claimed-amount cells are blank at this hour. They are Risk Management's cells. Risk Management holds the claim files and I do not, and I am not going to fill a column from a number somebody said in a hallway. Fill them from your own files and the page is complete.
Row five is filled. Incident 4474, teal, 2,000 gallons, City cost $5,570.00, claimed $183,800.00, claimant nine days old at filing, address as on the certificate. Factor: 33.
I have no opinion on the claimant. The page has one, and the page is one page, and one page is the only length that gets read before a check date.
Item three. The five jars.
This Bureau retains one sealed sample of every material it removes, by incident number, in glass, dated, ten years. Shelf inventory at this hour: 214 jars. Jar 4471 through jar 4474, continuous, no gap. The five entries on the re-designation list each have a jar on that shelf and each jar is the City's property and always has been.
The jars are available to Risk Management and to the City Attorney on the standard receipt, in this building, on request. No release is required from any party because there is no party in the chain and never was. I withdrew the release request for jar 4474 and I am not reopening it.
For the record, one line that is physical and does not reproduce. Every jar carries its collection date and the depth it was taken at. A color can be matched. A depth profile with a dry gutter under it cannot. On 4474: 11 inches at the shoulder, 62 feet of deposit, 9 feet at the widest, gutter dry its whole length, roadway dry, north gate dry. Whoever put that material on Reservoir Road put it where a truck does not reach.
Item four. The hazard differential, and this is a change of address and not a change of amount.
Crew in the vault: 9. Hours in the vault per shift: 41. Person-hours per shift: 369. Rate: $14 per hour per person. Per shift: $5,166. Tracking to close at three shifts: $15,498.00.
Requested of Human Resources, Classification. No answer in writing by 15:00 Thursday.
Request refiled here, to Risk Management, and it is the last one I have on this incident: fund the differential from the Acts of Cape line, on the crew sheet, as an incident cost.
It is not a classification question. It is 369 person-hours per shift inside a vault with four feet of chartreuse in it, and it exists because Incident 4471 exists. Acts of Cape is the line for damage caused by the individual or the material. This is that, and the crew sheet is the substantiation, one page, already written.
If the answer is no, Friday's close-out carries the line labeled unfunded with the word beside it, and that is the paragraph in the spring. I would rather the line be funded than the line be found.
Item five. 4471-PO-2, amendment to $2,000.00. Requested, endorsed by Transit and by Caped Affairs, not in writing. If it is not in writing by Friday 08:00, the pumps come off the vault at 08:00 and the yard bills what the yard billed: $4,800.00. Float then $2,300.00, fourteen days long, and the 22nd is back on the table with two days left to move. I have asked twice and I am not asking a third time.
Item six. Room 2, 15:00, ran twenty-two minutes. Three Restoration items went in: the amendment, the differential, the recovery page. Two came out unanswered. Noted.
Close-out filed Friday 12:00, after vault clear. Final gallons, final dump tickets, final crew hours, and every line on this incident that is not on a budget line, labeled, with the funding source written beside it.
D. Fenwick, Deputy Director, Bureau of Post-Incident Restoration, New Metropolis City Hall. We were here first.
D. Fenwick, Restoration. We were here first.